Capital construction plan of state property from the budget of the Republic of Crimea for 2016

Resolution of Council of Ministers of the Republic of Crimea from 29.06.2015 №363 "On issues of implementation of the activities of the federal target program" Social and economic development Republic of Crimea and Sevastopol until 2020".

Ordinance of Council of Ministers of the Republic of Crimea from 15.03.2016 №222-p " On issues of plan of capital construction at the expense of budget of the Republic of Crimea for 2016"

No

The main manager of funds, location, name of the object

Nature of work

Object estimated cost (thous. rub.)

Readiness degree of the object on 01.01.2016 (%) (%)

Balance the estimated value of the property at 01.01.2016
(thous. rub.)

Total costs of
2016
(thous. rub.)

Put into operationin in 2016

 
 

I. Implementation of the budget investments in the capital construction of state property of the Republic of Crimea and the acquisition of real property to the state ownership of the Republic of Crimea

 
  Municipality City District Kerch            
1 Reconstruction of the damaged sections of the water supply and sewerage ul.Ayvazovskogo in Kerch   32254,620 66,6 10784,620 5000,000 0,762 kilometers of Water Supply 0,6638 kilometers of sewerage
  Municipality City District Saki            
2 Extension to school №1, Saki - construction   74862,210 58,5 31084,940 19784,940 765,5 m2 building area
  Municipality City District Simferopol            
3 Correction of WP of a school in a residential neighborhood "Fontany" in Simferopole. Construction   474471,710 16,0 398695,030 398695,030 825 student places
4 Construction of pre-school institutions in md. "Zagorodnii" in Simferopol design and survey works (correction) 5935,000 0,0 5935,000 5935,000 design and survey works
  Municipality City District Feodosiya            
5 Construction of water pipeline from PS of III-rd lift water pipe lifting "Feodosia Sudak" to the storage tank in Kurortnoe   14783,590 47 7888,080 5888,080 5,1 kilometers of Water Supply
  Municipality Dzhankoysky region            
6 Gas pipelines construction of ten single-family homes in the area Timofeevka village,Dzhankoy   1930,340 27,1 1406,510 466,510 0,35 kilometers of gas supply
7 Construction of a kindergarten in the district s.Stalnoe, Dzhankoy design and survey works 13726,000 0,0 13726,000 13726,000 design and survey works
  Municipality Kirovsky region            
8 Reconstruction of water supply s.Otvazhnoe, Kirovsky district, Crimea   8 237,03 29,4 5815,605 5701,630 0,1 kilometers of Water Supply,
1 tower 
9 Reconstruction of the pumping station structures s.Sinitsyno, Kirov district, Crimea   4592,449 31,3 3153,270 3153,270 0,1 kilometers of Water Supply,
1 tower 
  Municipality Pervomaisky region            
10 Construction of modular boiler to "Kalinin School Pervomaisky district of Crimea   6 534,00 6,6 6104,229 5181,220  
  Municipality Simferopol region            
11 Construction of electric networks, p.Aykavan, Simferopol district  design and survey works 2670,000 0,0 2670,000 2670,000 design and survey works
12 Construction of electric networks Beloe-6 microdistrict 4 (с.Ana-Urt) Simferopol district design and survey works 3570,000 0,0 3570,000 3570,000 design and survey works
13 Construction of children's educational institution with 160 seats in s.Trudovoe, Simferopol district design and survey works (correction) 56799,270 92,2 4407,900 4407,390 design and survey works
  Municipality Chernomorsky region            
14 Construction of utilities and boiler for heating "Olenevsky Secondary School", Lenina 39, s.Olenevka, Chernomorsky region, Crimea   12500,000 0,0 12500,000 2849,000  
 
 

Republican objects

           
15 SEWARAGE PUMPING STATION with pressure pipe Krasnogvardeisky neuropsychiatric boarding in s.Nekrasovo, Krasnogvardeisky District - construction   29 404,73 14,8 25060,091 17685,610 25 m3/day
16 Construction of the r multiethnic culture youth center REPUBLICAN HIGHER EDUCATIONAL INSTITUTION «CRIMEAN ENGINEERING AND PEDAGOGICAL INSTITUTE» in Simferopol (the 1st start-up complex - Main Building). Phase I of the 1st start-up complex. Main building design and survey works (correction) 798000,000 0,0 798000,000 12432,650 design and survey works
17 Reconstruction of outdoor sports facilities for indoor sports complex at Simferopol, Dekabristov, 21     670279,000 0,0 664624,918 23719,879  
18 Construction of a heating to the airport complex "Simferopol" design and survey works 12000,000 0,0 12000,000 12000,000 design and survey works
19 Reconstruction of the embankment
Gurzuf, Republic of Crimea
design and survey works 38000,000 0,0 38000,000 1000,000 design and survey works
20 Reconstruction of shore protection structures
Gurzuf, Republic of Crimea
design and survey works 21000,000 0,0 21000,000 1000,000 design and survey works
21 Events for the construction of water supply system in the eastern part of the Crimean Peninsula, including: "The completion of Nijinsky, Prostornenskogo and Novogrigorevskogo intakes Adjustment projects." New construction (drilling) exploratory wells Nezhinsky abstraction "," New construction (drilling) exploration and production wells Prostornenskogo abstraction "," New construction (drilling) exploratory wells Novogrigorevskogo abstraction "," Construction of water intake Nijinsky, I, and II stages "," Construction Novogrigorevskogo intake, I, and II stages "," Construction Prostornenskogovodozabora, I, and II stages " design and survey works 932,000 0,0 932,000 932,000 design and survey works
22 Events for the construction of water supply system in the eastern part of the Crimean Peninsula, including: "Construction of the water supply path discharges into the North Crimean Canal to Feodosia and Kerch (2nd stage)"  design and survey works 5000,000 0,0 5000,000 4751,000 design and survey works
  Municipality Basewarage pumping stationhisaray region            
23 Construction a gas pipeline to the villages Plodovoe, Dubrovka, Dorognoe, Basewarage pumping stationhisaray region, Crimea   6103,000 0,0 6103,000 6185,000 design and survey works
24 Gas supply s.Kudrino, s.Mashino, s.Sinapnoe Basewarage pumping stationhisaray region, Crimea construction 5079,200 0,0 5079,200 5149,000 design and survey works
  Municipality Kirovskiy region            
25 High pressure gas pipelines to the villages Lgovskiy, Zolotoe pole, Privetnoye, Abrikosovka, Kirovsky district  construction 13556,280 0,0 13556,280 13687,000 design and survey works
  Municipality Saki region            
26 Gasification s.Vorobevo, Saki region, Crimea;   48738,110 0,0 48738,110 48738,110 10,36 kilometers of gas supply
27 Construction of the supply of high-pressure gas pipeline to s.Vinogradovo, Saki region,
Crimea
  44875,180 0,0 44875,180 61124,820 design and survey works
 
 

II. Providing subsidies to state budget, state autonomous institutions of the Republic of Crimea and state unitary enterprises of the Republic of Crimea on the implementation of investments in the capital construction of state property of the Republic of Crimea and the acquisition of real property to the state ownership of the Republic of Crimea

 
  Municipality City District Alushta            
1 Reconstruction of water supply networks s.Nizhnyaya Kutuzovka   6206,856 0,0 6206,856 6206,856  
  Municipality City District Kerch            
2 Reconstruction of heat supply system 1 st in Port Kerch lane design and survey works, construction 19064,010 2,0 18683,179 18683,179 2,58 Gcal/hour
 
 

Republican objects

           
3 Outer water supply of the reconstructed airport complex "Simferopol" construction 5547,000 0,0 5547,000 5547,000 design and survey works
4 Outer drainage of the reconstructed airport complex "Simferopol" construction 6119,500 0,0 6119,500 6119,500 design and survey works
5 External power supply networks for grid connection facilities of airport infrastructure created by the development of the airport complex "Simferopol", Republic of Crimea   36352,690 0,0 36352,690 10905,000 design and survey works
6 Construction of Olympic Training Aquatics Center of the Republic of Crimea   30000,000 0,000 30000,000 30000,000 design and survey works
7 Designing utilities telecommunications infrastructure LLC "International airport" Simferopol"   2734,600 0,0 2734,600 2734,600 design and survey works
8 Bank protection construction of wastewater treatment plants in Simeiz, Republic of Crimea    8960,000 0,0 8960,000 8960,000 design and survey works
9 Drilling and construction of artesian wells operating in the North-Sivash deposit of groundwater at the site "Perekopsky 1" (Pobedy, d.12A, s.Novorybatskoe, Krasnoperekopsk area , Republic of Crimea)   203,140 0,0 203,140 203,140 1 well